36x22 two story garage style shop. Zone 1 is 716 SF slab first floor PLUS 470 SF upstairs with air exchange via 42" stairwell need to keep above freezing and cool max upper 80's. Second floor is mostly wood and tool storage and perhaps the finishing room which will have a suitable exhaust fan.
Zone 2 is 420 SF in separate second floor as a finished rec room with say 50 F min and max 80 F. Finished means drywall, trim, floating floor, ceiling fans etc.
All 2x6 walls with fiberglass batt insulation. New construction, insulated 8' garage door and a few windows on second floor.
Located in south central MA with 0 F as a peak low temp and 100 F peak max. Typically 20-85 F.
My WAG is 2 ton heat pump with electric backup heat. Current plan is two zone with air handlers just inside the wall the heat pump will be located with very short line sets.
Keeping the first floor air handler as far away as possible from dust with plans for robust dust collector.
Questions
1. Is that the right sized HP?
2. Can/should I add a second air handler for zone 1 on the second floor with a long line set run around 30-40'?
3. Any reasonable options for additional heat source using scrap wood/pellets/used motor oil or is this more trouble and risk than it saves.
Zone 2 is 420 SF in separate second floor as a finished rec room with say 50 F min and max 80 F. Finished means drywall, trim, floating floor, ceiling fans etc.
All 2x6 walls with fiberglass batt insulation. New construction, insulated 8' garage door and a few windows on second floor.
Located in south central MA with 0 F as a peak low temp and 100 F peak max. Typically 20-85 F.
My WAG is 2 ton heat pump with electric backup heat. Current plan is two zone with air handlers just inside the wall the heat pump will be located with very short line sets.
Keeping the first floor air handler as far away as possible from dust with plans for robust dust collector.
Questions
1. Is that the right sized HP?
2. Can/should I add a second air handler for zone 1 on the second floor with a long line set run around 30-40'?
3. Any reasonable options for additional heat source using scrap wood/pellets/used motor oil or is this more trouble and risk than it saves.